Southeast Region

Work: Rodoanel Lote 6 – Solo Grampeado Trevo de Guarulhos – Nazaré Paulista –  SP

Tie Rods Descripition: TOR 25 CH

 

Work: Rodoanel Lote 4 – Contenções 401 e 408   – SP

Tie Rods Descripition: TOR 25 CH

 

Work: Túnel do Rodoanel Norte Lote 5 – SP

Tie Rods Descripition: TOR 25 TN

 

Work: Túnel Rodoanel Norte    Lotes 2 e 3 – Estrada Santa Inês – SP

Tie Rods Descripition: TOR 25 TN

 

Work: Túnel Rodoanel Norte   Lote 1 – Bairro de Taipas -SP

Tie Rods Descripition: TOR 25 TN

 

Work: Túnel da Serra do Cafezal – Rodovia Regis Bitencourt KM 330 – SP

Tie Rods Descripition: TOR 25 TN

 

Work: Prova de Carga – Scania – São Bernardo do Campo – SP

Tie Rods Descripition: TOR 23 B

 

Work: Solo Grampeado – Empreendimento Praia Brava – Itapevi – SP

Tie Rods Descripition: TOR 23 B e 20 CH

 

Work: Prova de Carga Condomínio Residencial e Comercial – Osasco – SP

Tie Rods Descripition: TOR 70 B

 

Work: Prova de Carga Idea Empreendimento – Vila Madalena – SP

Tie Rods Descripition: TOR 100 B

 

Work: Contenção de Muro Céu Arthur Alvim – Zona Leste – SP

Tie Rods Descripition: TOR 23 B

 

Work: Transversinas de Vão Rodovia dos Bandeirantes – SP

Tie Rods Descripition: TOR 36 TH

 

Work: Contenção de Muro – Carapicuíba – SP

Tie Rods Descripition: TOR 16 CH

 

Work: Contenção de Muro – Condomínio Reserva do Viana – Cotia – SP

Tie Rods Descripition: TOR 16 CH

 

Work: Parede Diafragma – São Bernardo do Campo – SP

Tie Rods Descripition: TOR 35 B

 

Work: Contenção Empreendimento Praia Brava – Itapevi – SP

Tie Rods Descripition: TOR 23 B

 

Work: Ancoragem de Viaduto CEAGESP – SP

Tie Rods Descripition: TOR 16 CH

 

Work: Prova de Carga – Edifício Misti Morumbi – Osasco – SP

Tie Rods Descripition: TOR  35 B e 45 B

 

Work: Prova de Carga – Jardim Fonseca – SP

Tie Rods Descripition: TOR  20 TN

 

Work: Prova de Carga – Edifício Girassol – Vila Madalena – SP

Tie Rods Descripition: TOR  100 B

 

Work: Solo Grampeado e Contra Forte – Ferrovia MRS Lavrinhas – SP

Tie Rods Descripition: TOR 36 TH

 

Work: Prova de Carga Fábrica Da Valid – Via Anchieta Km13 São Bernardo do Campo – SP

Tie Rods Descripition: TOR  23 B

 

Work: Parede Diafragma em Ed. Praia Gonzaga – Santos – SP

Tie Rods Descripition: TOR  34 AP

 

Work: Parede Diafragma em Ed. Ana Costa – Santos – SP

Tie Rods Descripition: TOR  51 AP

 

Work:  Solo Grampeado – Av. Sapopemba KM 31 a 33 – São Mateus – SP

Tie Rods Descripition: TOR 25 CH

 

Work: Prova de Carga Ed. Voir Park Aclimação – SP

Tie Rods Descripition: TOR 50 B

 

Work: Contenção de Emboque Oeste Lote 4 – Rodoanel – SP

Tie Rods Descripition: TOR 25 CH

 

Work: Monotrilho Linha 15 Prata – SP

Tie Rods Descripition: TOR 50 B

 

Work: Galpão Leroy Merlyn – Via Anchieta – São Bernardo do Campo – SP

Tie Rods Descripition: TOR 23 B

 

Work: Prova de Carga – Kalahari -Varanda Tatuapé – SP

Tie Rods Descripition: TOR 23 B

 

Work: Rodoanel Norte – Lotes 2 E 3 – Emboque Do Túnel 301 Oeste – São Paulo – SP

Tie Rods Descripition: TOR 23 B

 

Work: Alça De Acesso Km 23 – SP 150 – Rodovia Anchieta – SP

Tie Rods Descripition: TOR 23 B

 

Work: Cortina Atirantada – Otis Elevadores – São Bernardo do Campo – SP

Tie Rods Descripition: TOR 23 B

 

Work: Obra de Arte – Portal De Entrada Do Bairro Patrimônio – Brotas – SP

Tie Rods Descripition: TOR 15 B, 23 B e TOR 16 TN

 

Work: Muro De Contenção – Bairro São Pedro – São Bernardo Do Campo – SP

Tie Rods Descripition: TOR 23 B

 

Work: Duplicação Da Rod. Dos Tamoios, Cortinas Atirantadas e Works De Arte – SP

Tie Rods Descripition: TOR 23 B

 

Work: Cortina Atirantada E Prova De Carga – Arena Corinthians – SP

Tie Rods Descripition: TOR 23 B

 

Work: Cortina Atirantada Na Rodovia Airton Senna Km 19,7 Sentido Aeroporto De Cumbica – SP

Tie Rods Descripition: TOR 35 B Com Pintura Anticorrosiva

 

Work: CPTM/Metro – Linha 13 Jade – Lote 2 e 4 – Aeroporto Internacional De Guarulhos – SP

Tie Rods Descripition: TOR 16 TN, TOR 35 B e 50 B

 

Work: Rodovia Raposo Tavares – Km 39,5 – Galpão Industrial – Prova De Carga – SP

Tie Rods Descripition: TOR 35 B

 

Work: Works De Arte E Viadutos Km 16, 24 E 26 Rod. Dos Bandeirantes – SP

Tie Rods Descripition: TOR 35 B

 

Work: Provas De Carga E Works De Arte – Rodoanel Leste – SP

Tie Rods Descripition: TOR 35 B e 45 B

 

Work: Works De Arte E Solo Grampeado – Rodoanel Leste – SP

Tie Rods Descripition: TOR 35 B

 

Work: Muro De Contenção- Canalização Córrego água Preta – Travessia Sob a Marginal Tietê –  Barra Funda – SP

Tie Rods Descripition: TOR 45 B, 60 B, 70 B, 90 B e 100 B

 

Work: Emboque De Túnel E Cortina Atirantada – Rodoanel Lote 05 – SP

Tie Rods Descripition: TOR 45 B

 

Work: Prova De Carga Integração Av. Pinto de Aguiar à Gal Costa- Através de Túnel – SP

Tie Rods Descripition: TOR 60 B

 

Work: Prova De Carga – Edificio Voir Park Aclimação – SP

Tie Rods Descripition: TOR 50 B

 

Work: Prova de Carga ´- CPTM/Metro – Linha 13 Jade – Lote 2 E 4 – Aeroporto Internacional De Guarulhos – SP

Tie Rods Descripition: TOR 16 TN, TOR  23, 35 e 50 B

 

Work: Prova De Carga – Residencial Helbor Origem Tatuapé – SP

Tie Rods Descripition: TOR 80 B

 

Work: Prova De Carga – Empreendimento Don Klabin – SP

Tie Rods Descripition: TOR 60 B

 

Work: Prova De Carga – Rodovia SP 127 Km 82+500 – Tietê – SP

Tie Rods Descripition: TOR 50 B

 

Work: Prova De Carga Estática – Centro Paraolímpico Brasileiro – SP

Tie Rods Descripition: TOR 50 B

 

Work: Duplicação Serra Do Cafezal Emboque De Túneis – SP

Tie Rods Descripition: TOR 50 B

    

Work: Prova de Carga – Anis Empreendimentos Imobiliários Residencial K By – Chácara Klabin – SP

Tie Rods Descripition: TOR 60 B

 

Work: Prova de Carga – Alasca Empreendimentos Imobiliários Residencial Gioia – Aclimação – SP

Tie Rods Descripition: TOR 80 B

 

Work: Prova De Carga – Unip Anchieta – SP

Tie Rods Descripition: TOR 60 B

 

Work: Solo Grampeado – Edifício Fly – Rio Claro – SP

Tie Rods Descripition: TOR 16 TN e 20 TN

 

Work: Portal De Entrada Do Bairro Patrimônio – Brotas – SP

Tie Rods Descripition: TOR 25 TN

 

Work: Emboque de Túnel Leste e Oeste – Rodoanel Leste – SP

Tie Rods Descripition: TOR 25 TN

 

Work: Solo Grampeado – Taubaté – SP

Tie Rods Descripition: TOR 25 TN

 

Work: BR 101 Rio-Santos Km 21,9 Ubatuba – SP

Tie Rods Descripition: TOR 10 B

 

Work: Túnel 202 Oeste – Rodoanel Norte Lotes 2 e 3 – SP

Tie Rods Descripition: TOR 25 CH

 

Work: Viaduto de Ligação Rodovia Piassaguera Guarujá – 150 Rodovia Anchieta – SP

Tie Rods Descripition: TOR 20 B

 

Work: Prova de Carga – Estrada Velha Salto/Indaiatuba – SP 75 Saída 44 – SP

Tie Rods Descripition: TOR 35 B

 

Work: Travamento de Forma – UHE Cachoeira Caldeirão Ferreira Gomes – SP

Tie Rods Descripition: TOR 16 CH

 

Work: Prova de Carga Edifício Residencial Barra Park – SP

Tie Rods Descripition: TOR 40 TH

 

Work: Prova de Carga – Clube Residencial Allegro – Aricanduva – SP

Tie Rods Descripition: TOR 60 B

 

Work: Rodoanel Norte Lote 6 – Blocos Auxiliares para Treliças de Rancamento de Vigas – SP

Tie Rods Descripition: TOR 15 B

 

Work: Duplicação Rodovia dos Tamoios – 5ª Faixa Rodovia Ayrton Senna – SP – Rodovia Morretes – Antonina PR – BR 277

Tie Rods Descripition: TOR 23 B

 

Work: Contenção de Taludes Rodovia Presidente Dutra BR 116 KM 8,5 Trevo de Acesso Arujá – SP

Tie Rods Descripition: TOR 10 B

 

Work: Solo Grampeado – Residencial Ihome – Campinas SP

Tie Rods Descripition: TOR 16 TN

 

Work: Prova de Carga Estática em Estacas e Contenção de Taludes – São Caetano do Sul – SP

Tie Rods Descripition: TOR 44 TH

 

Work: Prova de Carga – Galpão Industrial Rodovia Raposo Tavares – Km 39,5 Sentido SP

Tie Rods Descripition: TOR 35B

 

Work: Cortina Atirantada – Roovia Airton Senna Km 11,7 ao 19,28 – Construção de Pista e Viaduto – SP

Tie Rods Descripition: TOR 15 B, 23 B e 35 B

 

Work: Túnel Santa Luzia – Rodoanel Leste – SP

Tie Rods Descripition: TOR 15 B, 23 B e TOR 16 TN

 

Work: Cortinas Atirantadas e Works de Arte -Duplicação Rodovia Dos Tamoios – SP

Tie Rods Descripition: TOR 23 B

 

Work: Obra Residencial Contenção – Petrópolis – RJ

Tie Rods Descripition: TOR 23 B

 

Work: Cortina Atirantda – Cond. Res. Bosque Do Montreal Zetrópolis – RJ

Tie Rods Descripition: TOR 15 B

 

Work: Solo Grampeado e Cortina Atirantada – Nova Friburgo – RJ

Tie Rods Descripition: TOR 23 B e 36 TH

 

Work: Contenção de Muro – RJ

Tie Rods Descripition: TOR 23 B

 

Work: Ponte BR 393 Rodovia Lucio Meire KM 246- Barra do Piraí – RJ

Tie Rods Descripition: TOR 16 CH

 

Work: Solo Grampeado – L’oreal Brasil Pesquisa e Desenvolvimento – RJ

Tie Rods Descripition: TOR 25 CH

 

Work: Cortina Atirantada Condomínio Residencial Bosque do Montreau – Petrópolis – RJ

Tie Rods Descripition: TOR 15 B

 

Work: Ponte em Cima do Rio Paraíba – Vassouras – RJ

Tie Rods Descripition: TOR 36 TH

 

Work: Cortina Atirantada – Rio de Janeiro – RJ

Tie Rods Descripition: TOR 35 B

 

Work: Cortina Atirantada Cervejaria Cidade Imperial – Petrópolis – RJ

Tie Rods Descripition: TOR 15 e 23 B

 

Work: Contenção Estrutural Cervejaria Cidade Imperial – Petrópolis – RJ

Tie Rods Descripition: TOR 15 B

 

Work: Obra Copasa – Santo Antônio de Pádua – RJ

Tie Rods Descripition: TOR 45 B

 

Work: Contenção Vila Joaniza – Ilha do Governador – RJ

Tie Rods Descripition: TOR 23 B e 25 CH

 

Work: Solo Grampeado Ferrovia MRS Três Rios – RJ

Tie Rods Descripition: TOR 23 B

 

Work: Contenção Rio Bengalas – Nova Friburgo – RJ

Tie Rods Descripition: TOR 45 B

 

Work: Cortina Atirantada Faculdade de Medicina de Petrópolis – RJ

Tie Rods Descripition: TOR 23 B, 35 B e 25 CH

 

Work: Cortina Atirantada Residencial Olavo Bilac – Petrópolis – RJ

Tie Rods Descripition: TOR 23 B

 

Work: Reforço Estrutural – Passeio Olímpico Rio 2016 e Velódromo Rio 2016 – RJ

Tie Rods Descripition: TOR 10 B e 35 B

 

Work:  Prova de Carga Hotel Resende – RJ

Tie Rods Descripition: TOR 23 B

 

Work: Contenção De Talude Em Santa Tereza – RJ

Tie Rods Descripition: TOR 23 B

 

Work: Contenção De Encosta Da Lagoa Rodrigo De Freitas – RJ

Tie Rods Descripition: TOR 15 B e 23 B

 

Work: Cortina Atirantada – Subestação Itamarati – RJ

Tie Rods Descripition: TOR 23 B e 16 CH

 

Work: Parque Olímpico Rio 2016 – Arena De Handebol – RJ

Tie Rods Descripition: TOR 23 B

 

Work: Contenção  Cortina Atirantada Conjunto Zildo Arms – Niterói – RJ

Tie Rods Descripition: TOR 23 B

 

Work: Microdrenagem – Rio Acarí – RJ

Tie Rods Descripition: TOR  23 B

 

Work: Cortina Atirantada – Faculdade De Medicina De Petrópolis – RJ

Tie Rods Descripition: TOR 23B, 35 B e TOR 25 CH

 

Work: Prova De Carga Hotel Resende – RJ

Tie Rods Descripition: TOR 23 B

 

Work: Contenção De Fundação – Shopping Bossa Nova Mall – Atrás Do Aeroporto Santos Dumont – RJ

Tie Rods Descripition: TOR 35 B e TOR 34 AP

 

Work: Ponte Divisa Rio – Espírito Santo – BR 101 Km 1 – RJ

Tie Rods Descripition: TOR 35 B

 

Work: Contenção De Encostas e Contra Fortes – Teresópolis – RJ

Tie Rods Descripition: TOR 35B

 

Work: Prova De Carga – Refinaria Petrobras – RJ

Tie Rods Descripition: TOR 35 B

 

Work: Solo Grampeado – Morro Cantagalo – RJ

Tie Rods Descripition:  TOR 15 B

 

Work: Contenção de Parede Diafrágma – São José do Vale do Rio Preto – RJ

Tie Rods Descripition:  TOR 23 B e 35 B

 

Work: Ponte Divisa Rio – Espírito Santo – BR 101 Km 0 – RJ

Tie Rods Descripition:  TOR 23 B e 35 B

 

Work: Balanço Sucessivo – Serra das Araras – RJ

Tie Rods Descripition:  TOR 15 B

 

Work: Solo Grampeado – Rodovia BR 101 Km 435 – Magaratiba – RJ

Tie Rods Descripition:  TOR 20 B

 

Work: Cortina Atirantada – Rodovia BR 101 Km 481 – Trevo de Angra dos Reis – RJ

Tie Rods Descripition:  TOR 36 TH

 

Work: Contenção de Encostas – Trevo de Acesso – Rodovia Presidente Dutra – BR 116 Km 186 Santa Isabel – RJ

Tie Rods Descripition:  TOR 10 B

 

Work: Quadra de Tênis – Parque Olímpico Rio 2016 – RJ

Tie Rods Descripition:  TOR 36 e 44 TH

 

Work: Reforço de Cortina Atirantada – Pouso Alegre – MG

Tie Rods Descripition:  TOR 35 B

 

Work: Cortina Atirantada – Belo Horizonte – MG

Tie Rods Descripition:  TOR 20 CH

 

Work: Cortina Atirantada Via 040 – Belo Horizonte – MG

Tie Rods Descripition:  TOR 36 TH

 

Work: Cortina Atirantada – Condomínio Vilage Nobre – Ipatinga – MG

Tie Rods Descripition: TOR 23 B

 

Work: Cortina Atirantada – Arteris Rodovia Fernão Dias Km 76 Sentido BH – MG

Tie Rods Descripition: TOR 60 B

 

Work: Solo Grampeado – Anglo American – MG

Tie Rods Descripition: TOR 20 CH e 23 B

 

Work: Obra De Arte Na Av. Vilarinho – Belo Horizonte – MG

Tie Rods Descripition: TOR 35 B e 23 B

 

Work: Prova de Carga Ed. Administrativo – Belo Horizonte – MG

Tie Rods Descripition: TOR 50 B

 

Work: Cortinas Atirantada e Works De Arte – Nova Era – MG

Tie Rods Descripition: TOR 35 B

 

Work: Prova De Carga Fábrica Danone – Poços De Calda – MG

Tie Rods Descripition: TOR 60 B

 

Work: Prova De Carga em Estaca Raiz – Edifício Manhathan Square – Belo Horizonte – MG

Tie Rods Descripition: TOR  36 TH

 

Work: Reforço Estrutural – Residencial Assunção Life – MG

Tie Rods Descripition: TOR  15 B

 

Work: Prova De Carga Estática – Catedral Metropolitana Cristo Rei (Projeto De Oscar Niemayer) Belo Horizonte – MG

Tie Rods Descripition: TOR 100 B

 

Work: Túneis Antonio Dias e Prainha – 1280 metros – Antonio Dias – MG

Tie Rods Descripition: TOR 25 TN

 

Work: Prova de Carga em Estacas – Hospital Regional Teófilo Otoni – MG

Tie Rods Descripition: TOR 45 B

 

Work: Prova De Carga Em Estaca – Hospital Regional Teófilo Otoni – MG

Tie Rods Descripition: TOR 45 B

 

Work: Obra De Contenção Da Prefeitura De Atilio Vivacqua – ES

Tie Rods Descripition: TOR 23 B

 

Work: Cortina Atirantada – Sebrae Vitória – ES

Tie Rods Descripition: TOR 60 B

 

Work: Paredes Subsolo Do Edifício Rio Doce – ES

Tie Rods Descripition: TOR 35 B